Waterway Terminals

The Transpetro waterways terminals are operated by piers, monobuoys or mooring system.

TRBA

TRBA.jpg

Third Flexible LNG Regasification Terminal in Brazil, Bahia Regasification Terminal (TRBA) has the capacity to heat, regasification and inject the gas pipeline GASCAC up to 14 million m3/day

 

Address:

Av. Milton Bahia Ribeiro, 2.744
CEP 42600-000
Madre de Deus/BA

 

Founded in 2014
Product LNG - Liquefied Natural Gas
Tankage (m³) 138.000 (aboard the FSRU)